Transmission Siting and Permitting OS
We can build generation fast, but the high-voltage transmission needed to move electrons from where energy is produced to where demand is stalls in multi-year planning, siting, and cost-allocation fights.
The Stakes
If transmission build speed stays slow, clean electricity becomes a paper transition. The opportunity cost is massive: stranded renewables, higher prices, more gas dependence, and increased blackout risk. Grid build speed is not a “climate nice-to-have.” It is a hard physical constraint on abundance and industrial competitiveness.
Headline evidence
- •The International Energy Agency (IEA) estimates that at least 3,000 gigawatts (GW) of renewable power projects are waiting in grid connection queues, including 1,500 GW in advanced stages. [1]
- •The IEA estimates over 80 million kilometres (km) of grids must be added or refurbished by 2040, roughly equal to the entire existing global grid. [1]
- •The Federal Energy Regulatory Commission (FERC) Order No. 1920 framework requires at least three long-term regional transmission scenarios, using best available data, with no less than a 20-year horizon, reassessed at least every five years. [2]
Neglectedness
Why it stays neglected
Transmission is a coordination nightmare. Benefits are regional and long-lived; costs are local and immediate. “Permitting” is not one permit, it is a tangled graph of landowners, environmental review, state and local approvals, tribal consultation, and litigation risk. Meanwhile, regulated utility incentives often favor capex that is easiest to approve locally, not what is system-optimal.
Tractability
The window is real because the planning regime is shifting and the data layer is improving. FERC’s long-term planning rules create a clearer compliance backbone. What remains hard is turning scenario planning into executable projects: right-of-way acquisition, credible cost allocation, and trusted community process. AI-value is highest where it compresses analysis, not where it replaces legitimacy.
Startup surfaces
- •“Transmission corridor CRM” for routing, landowner outreach, and permissioning workflow
- •Automated benefit-cost allocation workbench aligned to FERC Order 1920 requirements
- •Environmental and cultural review copilots that generate defensible, auditable documentation
- •Inter-regional queue and constraint mapping using open grid models and telemetry
- •Contracting and scheduling platforms for transformer, conductor, and high-voltage direct current (HVDC) supply bottlenecks
Source Stack (3)
- [1] International Energy Agency. Electricity Grids and Secure Energy Transitions: Executive summary. (2023).
- [2] Federal Energy Regulatory Commission. Explainer on the Transmission Planning and Cost Allocation Final Rule (Order No. 1920, 1920-A, 1920-B). (2024–2025).
- [3] Federal Energy Regulatory Commission. FERC Takes on Long-Term Planning with Historic Transmission Rule (news release). (May 13, 2024).